“Dear Supplier: you don’t do this. You have failed to do that. Your quality is poor. You struggle to deliver.”
That was the email, more or less. A client of mine, an ingredients supplier to a large FMCG company, had just been invited to an “improvement meeting” by their customer’s procurement team. The buyer had listed the complaints their internal stakeholders were raising, and added that, given the long history between the two companies, they wanted to sit down and sort things out. Now!
My client sent me the draft agenda they had prepared, and asked what I thought.
I thought they were about to lose the account.
Here is what they had planned to walk in with:
Agenda point #1: Review of the history of the B2B relationship. Reasoning by the supplier: We first want to outline the great work we have done as the supplier for the customer over time (which the buyer might not be aware of) to create a level of goodwill.
Agenda point #2: Our view of the stated issues and potential root causes. Reasoning: We want to highlight the problems we faced with some of the customer’s internal stakeholders that made it difficult for us to do our job properly. We cannot be blamed for issues the customer is responsible for.
Agenda point #3: Open discussion to find a solution to the problems. Reasoning: We want to have an open-minded dialogue with the buyer outlining that we are committed to working with the client to resolve the issue.
Three agenda points. All three wrong. Mostly.
The first one is easy to deal with: drop it. The buyer already knows there is value in working with you. If they did not, you would not be in the room. They would be running a tender and talking to your competitor instead. A supplier who opens a rescue meeting with a highlight reel of its own achievements has misread the situation completely. You are not there to be admired. You are there because something is broken.
The second one is where suppliers really lose the plot. The buyer who sent that email is the messenger. They are relaying feedback from R&D, from operations, from quality. And here is the part nobody thinks about: they chose you. When they selected you as the supplier, they put their own name on that decision. So when your quality slips and your deliveries wobble, it is not only your reputation on the line. It is theirs.
Which means the buyer has almost certainly already defended you inside their own company. They have already taken the awkward questions about why they picked you in the first place. The last thing they need is for you to arrive and explain how 80% of the issue is actually the fault of the customer. Do that, and you take your one ally in the building and quietly turn them into someone who stops fighting for you.
Of course, the customer needs to take on responsibility for their mistakes as well. Using their shortcomings as a “carte blanche” to hide behind is a tactic that will backfire.
The buyer is not your opponent in this meeting. They are the only ally you have left in the room.
The third agenda point is the one that feels safe and is actually the most dangerous. “We are open to hearing your suggestions for next steps and are ready to support” sounds collaborative and mature. To a buyer under pressure, it reads as a supplier who still has not understood how serious this is. When procurement asks you to fix a failing relationship, they are not looking for a discussion. They are looking for a plan. Your plan. Within their given constraints and shortcomings.
The buyer is more exposed than you are
Behind that polite email is someone who is anxious: anxious that this gets worse, and anxious that they will be the one carrying the blame when it does. There is a good chance they are already building a plan B, quietly qualifying an alternative supplier so they are covered the next time you disappoint them. This meeting is not a performance review. It is the last exit before that plan B becomes the plan.
So treat it like one.
What I told my client to do
Forget who was to blame. Forget whose mistake it was first. Build an agenda around one thing only: exactly what you will do differently, starting now to salvage the situation.
Then make it specific enough for the buyer to carry upward. When we train suppliers to build an action plan, we insist on five things: what you will do, how you will do it, by when, who is accountable by name, and the immediate next steps. “The supply chain team will look into it” is not a plan. It is a way of guaranteeing nobody owns it. Give the buyer a named person and a date, and you have handed them something they can put in front of their own manager.
Put a dedicated (SWAT) team on the problem that lives inside the issue list. Spell out exactly what they will do, and stay on it until the issue is gone.
Consider changing the account team, even if the failures were not their fault, because doing so tells the customer you are treating this with the seriousness it deserves.
And bring your senior leadership into the room to present the plan, even if you normally only ever deal with a junior buyer. Sending your most senior people to a junior buyer is not a waste of their afternoon. It is the clearest signal you can send that this relationship matters to you.
No one has ever saved themselves out of a crisis by explaining it. When procurement gives you a last chance, they have stopped listening to what you say and started watching what you do.